a
a
Weather:
No weather information available
HomeEngineeringIndia has 234 GW renewable energy pipeline, installed capacity at 220.10 GW: MNRE

India has 234 GW renewable energy pipeline, installed capacity at 220.10 GW: MNRE

As per the data, the country added 29.52 GW of renewable energy capacity in 2024–25.
No comments

Sorry, the comment form is closed at this time.

Translate »